2026 Build & Delivery Schedule: Limited Annual Commissions
To maintain our commitment to heirloom-quality craftsmanship, The Stockton Mill accepts only SIX major bunk bed commissions per calendar year. Each commission is assigned a dedicated "Build Slot" on a strict first-come, first-served basis.
Current 2026 Availability:
-- Build Slot #1 (Spring Series)
Status: [RESERVED]
Estimated Delivery: March 2026
-- Build Slot #2 (Spring Series)
Status: [RESERVED]
Estimated Delivery: May 2026
-- Build Slot #3 (Summer Series)
Status: AVAILABLE
Estimated Delivery: July 2026
-- Build Slot #4 (Late Summer Series)
Status: AVAILABLE
Estimated Delivery: September 2026
-- Build Slot #5 (Fall Series)
Status: AVAILABLE
Estimated Delivery: October 2026
-- Build Slot #6 (Winter Series)
Status: AVAILABLE
Estimated Delivery: December 2026
The "Next-In-Line" Policy:
When you purchase your suite through our shop, you are automatically secured in the very next available Build Slot. In the event of simultaneous purchases, slots are assigned based on the exact timestamp of the order. If your preferred window is missed by a prior checkout, you will be immediately notified and moved to the next opening on the calendar.
Design Notes:
-- Custom engineering and material sourcing begin the moment your slot is secured.
-- Delivery dates are estimates based on build complexity and transit logistics.
-- For real-time availability or to discuss a specific deadline, please contact Terry at 417-691-6200.
Limited 2026 Commission Series
To ensure every Stockton Mill piece is an architectural masterpiece, we only accept 6 major builds per year. View our schedule to see the next available delivery window for your home